google-site-verification: googled975c1a1ea3733fa.html

Layer 3

 

Custom-Designed Employee Work Schedules

 

clock-circular-outline 8:00am - 5:00pm (Central Time Zone), Mon-Fri  

Blog

8-Hour Fixed Shift Schedules
July 12th, 2022 at 4:05 pm   starstarstarstarstar      

Many companies that operate 24/7 have their employees work an 8-hour fixed shift schedule. With this type of schedule, employees never change shifts, but may work different days each week following a multi-week work pattern. This is called a fixed shift schedule with rotating days of work. Unlike a schedule with fixed shifts and fixed days of work, this approach treats everyone equally in terms of weekends off, so it tends to be the preferred approach.

When these companies first started covering 24/7, they may have adopted a work pattern that was popular for their line of business or the managers had some experience with. The schedule may have worked fine initially, but as the company grew and added more employees, management didn’t update the schedule. They may not have realized that the pattern only works properly for a specific coverage level.

Let’s take a closer look at two popular 8-hour work patterns to understand why they only work under certain conditions. We will only show one shift (the 8-hour day shift = d8) since the pattern will be the same for all 3 shifts. Each crew should have the same number of people, so that the coverage is consistent from day-to-day.



4-on-2-off

               

Crew / Week

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Hours

A / Week 1

d8

d8

d8

d8

-

-

d8

40

B / Week 2

d8

d8

d8

-

-

d8

d8

40

C / Week 3

d8

d8

-

-

d8

d8

d8

40

D / Week 4

d8

-

-

d8

d8

d8

d8

40

E / Week 5

-

-

d8

d8

d8

d8

-

32

F / Week 6

-

d8

d8

d8

d8

-

-

32

             

Average

37.3

 

The way this pattern works is there are 6 crews for each shift, labeled A, B, C, D, E and F. Each crew begins the schedule in the week they are shown. Crew A begins on Week 1, Crew B begins on Week 2, Crew C begins on Week 3, and so on. After finishing that initial week, they rotate to the next week of the schedule. Crew A moves to Week 2, Crew B moves to Week 3, and Crew F moves to Week 1. They continue this rotation until after Week 6, in which they rotate back up to Week 1.

If you start at the top, you’ll see that you would work 4 days (Thu-Sun) and have the next two days off (Mon-Tue). Then you would work 4 more days (Wed-Sat) and have the next two days off (Sun-Mon). This pattern of working 4 days in a row and then taking the next 2 days off continues indefinitely.

You’ll see that there are four d8s shown under each day of the week. This means that 4 crews are always scheduled to work. If you need 4-person coverage, you would simply have one person in each of the 6 crews. If you need 8-person coverage, you would have two people in each of the crews.

But what if you need 3-person coverage or 5-person coverage or something else that isn’t a multiple of 4? That’s where this pattern stops working correctly. Yes, people use it for the wrong coverage levels or with the wrong number of crews and wonder why the coverage isn’t consistent. It only works properly for coverage that is a multiple of 4 people. And it only works if you use 6 crews on each shift.

Employees like this pattern because they only have to work 4 consecutive days and they always get 2 days off. They don’t like that they only get one full weekend off every 6 weeks. In addition, there are 2 weeks in which they only get 32 hours of pay. You could add more days to make 40 hours, but that would disrupt the 4-on-2-off pattern.

 

Here's another pattern:


6-on-3-off

               

Crew / Week

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Hours

A / Week 1

d8

d8

d8

d8

d8

d8

-

48

B / Week 2

-

-

d8

d8

d8

d8

d8

40

C / Week 3

d8

-

-

-

d8

d8

d8

32

D / Week 4

d8

d8

d8

-

-

-

d8

32

E / Week 5

d8

d8

d8

d8

d8

-

-

40

F / Week 6

-

d8

d8

d8

d8

d8

d8

48

G / Week 7

-

-

-

d8

d8

d8

d8

32

H / Week 8

d8

d8

-

-

-

d8

d8

32

I / Week 9

d8

d8

d8

d8

-

-

-

32

             

Average

37.3

 

This pattern uses 9 crews on a 9-week pattern. It works the same way as the previous schedule. The crews begin the schedule in the week they are shown next to: Crew A begins in Week 1, Crew B begins in Week 2, and so on. After finishing that initial week, they rotate to the next week of the schedule. After completing Week 9, they rotate up to Week 1 and start the pattern over again.

You’ll see that there are six d8s listed under each day of the week. This means that 6 crews are always scheduled to work. If you need 6-person coverage, you would simply have one person in each of the 9 crews. If you need 12-person coverage, you would have two people in each of the crews.

Using this pattern with anything other than 9 crews throws everything off. Likewise, trying to achieve any coverage level that isn’t evenly divisible by 6 won’t consistently produce the coverage you want.

 

Recommended Approach

So, if these popular 8-hour patterns only work for a limited number of situations, how are you supposed to pick a schedule? You should always begin with the desired coverage level. In this article, I will discuss 3 coverage levels:

  • 1-person
  • 2-person and multiples of 2 people such as 4, 6, 8, etc.
  • 3-person and multiples of 3 people such as 6, 9, 12, etc.

I won’t address odd coverage levels (such as 5, 7 or 11) as these would require a custom-designed schedule, often without any crews.

I will show one pattern for each level of coverage, even though there are many others that are superior. Sorry, you have to pay for the good stuff. The patterns shown here simply illustrate the point that schedule selection should never begin with a preferred pattern. Instead, coverage levels should always be the starting point for schedule creation. Coverage levels dictate the number of crews or employees needed for each shift. Once that has been established, you can compare different work patterns using that number of crews/employees.

1-Person Coverage

             

Crew/Week

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Hours

A / Week 1

-

d8

d8

d8

d8

d8

-

40

B / Week 2

d8

d8

-

-

d8

d8

d8

40

             

Average

40

 

With 2 crews working 40 hours a week, there will always be 3 days a week with double coverage on each shift. In the pattern above, this occurs every Friday, Monday and Tuesday. If you eliminate the extra coverage, employees would only average 28 hours a week. Full-time employees won’t tolerate this, which is why it’s not shown.

This inefficiency is why 8-hour fixed shifts are rarely used when you need 1-person coverage. Other approaches such as 8-hour rotating shifts or any type of 12-hour shift schedule would only require 4 people, though they do make employees work an average of 42 hours a week.

Employees like this sort of schedule because they get every other weekend off. But it requires a lot more employees than other approaches, so few organizations can afford to adopt it. If you have unlimited resources and can tolerate the double coverage three days a week, go for it! Better yet, why not adopt a 12-hour fixed shift schedule that requires 33% fewer employees and gives them almost twice as many days off.

 

2-Person Coverage (and multiples of 2 people)

     

Crew/Week

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Hours

A / Week 1

-

d8

d8

d8

d8

d8

-

40

 

B / Week 2

d8

d8

d8

-

-

d8

d8

 

40

C / Week 3

d8

-

-

d8

d8

d8

d8

40

             

Average

40

 

Unlike the pattern for 1-person coverage, this is more efficient because it only has 1 day of extra coverage every week. In the above example, there are 3 d8’s every Tuesday. This schedule can be used coverage that is any multiple of 2 people such as 4, 6, 8, 10, etc.

The pattern shown here is not very good for employees, however, since they would never get a full weekend off. Don’t be discouraged. There are other patterns that provide one full weekend off every 3 weeks, some that are up to 4 days long. Like I said, you have to pay to see the good ones.

You could drop the Tuesday shift in either Week 1 or Week 2 of the above pattern, but then the employees would only get 32 hours that week. Over a 3-week period, they would average 37.3 hours/week, the same as the 4-on-2-off and 6-on-3-off patterns shown earlier. In some cases, depending on the pay week, dropping the unnecessary coverage might extend the weekend off so that employees wouldn’t mind getting fewer hours of work/pay.

 

3-Person Coverage (and multiples of 3 people)

     

Crew/Week

Thu

Fri

Sat

Sun

Mon

Tue

Wed

Hours

A / Week 1

-

d8

d8

d8

d8

-

d8

40

B / Week 2

d8

d8

d8

-

-

d8

d8

40

C / Week 3

d8

d8

-

d8

d8

d8

d8

48

D / Week 4

d8

-

d8

d8

d8

d8

-

40

             

Average

42.0

 

8-hour fixed shift schedules for 3-person coverage (or multiples of 3) are the most efficient of all, since there is no unnecessary extra coverage. They do require a small amount of overtime, however.

For employees, the above pattern wouldn’t be very attractive since they would never get a full weekend off. There are other patterns using 4 crews per shift that provide weekends off. A pattern that is based on working 5 shifts in a row will provide 5 weekends off each year. A pattern based on working 6 shifts in a row will provide 6 weekends off each year. A pattern based on working 7 shifts in a row will provide 13 weekends off each year.

For work-life balance, many employees will say that working 7 consecutive days to get 1 weekend off every 4 weeks isn’t worth it. But the prospect of only getting 5 or 6 weekends of a year is even worse. That is exactly why so many companies have switched to 12-hour shifts. They found that both the company and the workers benefitted from the longer shifts. Yes, workers hated working for 12 hours, but they accepted the long hours to get twice as many days off and up to half the weekends off (12 Hour Shifts | Shift Schedule Design (shift-schedule-design.com)).

 


Summary
When choosing an 8-hour fixed shift schedule, adopting a well-known or familiar work pattern, such as the two discussed in this article, will only work properly if your coverage and number of crews match the pattern’s requirements. If your coverage or staff size doesn't match, you may have to overstaff to reach your desired coverage level and the coverage will vary from day-to-day.

Many of these well-known patterns average less than 40 hours a week - not the most effective way to utilize your employees. For employees, although the pattern may be easy to remember or explain, they rarely provide as many weekends off as other 8-hour options.

The best way to select an 8-hour fixed shift schedule is to start with the desired coverage level. That, in turn, will dictate how many crews are necessary. Three of the most common approaches were discussed in this article:

  • One-person coverage using 2 crews per shift, or 6 total crews.
  • Two-person coverage (or multiples of 2) using 3 crews per shift, or 9 total crews.
  • Three-person coverage (or multiples of 3) using 4 crews per shift, or 12 total crews.

Once the number of crews is decided, the company can search for compatible work patterns. That way, employees can discuss and compare the different patterns, and then vote for the one they prefer. I recommend that you also include a few options using 12-hour shifts, just so the employees are aware of what else is possible. Naturally, I hope you'll consider our company to show you these different options. Please click on this link below and fill out the form. I'll respond with a proposal that outlines the best solutions and what I would charge to create them for you.

 

Request a quote for custom schedule design)

 

Derek boyd says:
April 5th, 2024 at 8:49 pm   starstarstarstarstar      

Looking for schedule to cover 24/7 with 7 or 6 employees separate into 3 shifts. 8,10, or 12 hours. Looking for equal time of weekend's off.

parker,A says:
August 26th, 2024 at 1:41 pm   starstarstarstarstar      

Looking for a 40hr a week schedule to cover 8 people on a 8 hrs shift for 14 hr coverage.   From 0600 to 2030 hrs. at least 2 per shift shift.

 Also looking for a 40 hr work schedule for 8 people on a 10 hr shift for 14 hrs. of coverage. From 0600 to 2030 hrs at least 2 per shift.

Jonny  says:
September 9th, 2024 at 9:37 am   starstarstarstarstar      

 Looking for 37.5hr week schedule to cover 6 people working an 8-hour shift. Monday to Friday 24hrs, starting Monday 6am and finishing on Saturday morning at 6am. With at least 2 per shift.  In the past A three-week pattern has been used to cover the 6-2,2-10& 10-6 but we are trying to work less nights so looking for a different schedule. We have the option to change working hours if it’s easier to work out a better pattern to ensure the 24hr operation during the week is maintained. 

Wilson Thomas says:
November 7th, 2024 at 7:14 pm   starstarstarstarstar      

Hi,

 

Can you please make a schedule with 3 breakfast servers, 6 lunch servers and 12 dinner servers. Our dining periods are 4 hours each. I need to provide as many servers full time hours and the rest with part time or on call shifts. The problem is that the schedule is from monday to saturday. Can you please help me out?

 

Thank you.

Dave Ferrell says:
January 15th, 2025 at 1:07 pm   starstarstarstarstar      

Interested in moving my staff to 8's from current 12's in a 24/7/365 operation.  Will be working with 14 total staff and need three on duty per shift.  The numbers give me 5 on days, 5 on evenings, and four will be on nights.  Can offer OT as needed for any gaps that might come up, given call offs and etc.. 

Anthony porras says:
November 19th, 2025 at 2:11 pm   starstarstarstarstar      

I have 5 employees all of which have to have 40 hours 7am to 3pm Monday through friday but I also need to have 1 person cover weekends as well without working 7 days in a row it's a set schedule Monday through friday and everyone will have to rotate weekends  I can't figure it out

Name * 
Email * 
Rate This Post  
Spam Protection