8-Hour Shift Schedules with No Built-in Overtime
January 31st, 2013 at 12:21 pm   starstarstarstarstar      

It's amazing how many people contact me about 24/7 schedules with no overtime in them. I warn them that this will not necessarily lower their costs. I also explain that avoiding overtime in the schedule will not eliminate the need for overtime. OT will still be needed to cover absences or temporary increases in demand. Here are links to two articles I've previously written on this subject:

It's best to think of overtime as a way to increase the size of your staff without adding to the headcount. A small amount of overtime in the schedule means you will need fewer employees to produce a specific amount of coverage. Overtime also can enable you to build relief coverage into the schedule to cover absences. In some cases, it's possible to reduce the total overtime by doing this (https://www.shift-schedule-design.com/Blog?m8:post=you-can-t-eliminate-overtime-but-you-might-be-able-to-reduce-it). 

The bottom line is: if you eliminate overtime from the schedule, you will increase the staffing requirements. In most cases, the increased headcount will be more expensive than the overtime was.

Despite these words of warning, I know that some of you still want to see schedules with only 40 hour work weeks. Let's take a look at an example using 8-hour rotating shifts. If you want a 12-hour schedule without overtime, I suggest you read this other blog post here.



This is a 5-crew schedule that follows a 5-week schedule. Crew A begins the schedule in Week 1, Crew B begins in Week 2, and so on. When the crews finish their first week, they move down to the next week of the schedule. When they finish Week 5, they start the cycle over again with Week 1. All five crews are working the same 5-week schedule. It's just that they are always in different weeks of that pattern.

You'll note that the 5th week of the schedule has only one required shift: the Tuesday night shift. The prior four shifts are relief shifts. These can be used to cover absences or for training, maintenance, or special projects. The only downside is that it doesn't cover every day of the week. Had we adopted a schedule that averaged 42 hours a week, we could have had relief coverage for every day of the week.


Is it worth eliminating the overtime? Let's look at the numbers.

We eliminated 2 hours of overtime a week for every employee. That will reduce the costs by 7.5%.

          2 hours OT/week * 1.5 OT premium = 3 hours/week

          3 hours/week saved  / 40 hours/week = 7.5% savings

We also have gained 4 days of relief coverage each week. If the absence rate is 10% of the normal weekly hours of work, this will reduce costs another 8.6%.

          4 / 7 days of coverage/week * 10% absence rate * 1.5 OT premium = 8.57%

This means that the total savings is 16.1% (7.5% + 8.6% = 16.1%). However, we have increased the headcount by 25% by adding a fifth crew, which is far more than the 16.1% we saved.

 

Want to read more about 8-hour shift schedules? Here are links to several articles I've written:

 

Posted in Staffing, Overtime by Bruce Oliver
October 23rd, 2016 at 10:17 pm   starstarstarstarstar      
Brittany,
 

 

You never said how many people you want working on each shift. Your staff of 18 people is enough for 4-5 person coverage if you worked an average of 42 hours a week. At 40 hours a week, you would have 4 person coverage on each shift.
 
With 4-person coverage that means 4 people have to work every 6 weeks, which in turn means 2 weekends off every 6 weeks is the max you could ever get with 8-hour shifts. If you want every other weekend off, you're going to have to use 12-hour shifts or drop the coverage to 3 people. I can't imagine using 18 people for 3-person coverage; it's a huge waste of money but, then again, so is avoiding OT in the schedule.

 

 
Darko says:
April 27th, 2017 at 4:24 am   starstarstarstarstar      

Hello,

 

I am trying to make a shift rotation between 5 employees to cover 24/7. What I am thinking now is to somehow have 8 hrs shifts mon-fri and 12 hrs shifts on weekends (3 guys to cover weekdays and 2 on weekends). Now, what I exactly need is a form or a blueprint for rotation so everyone can have approx the same amount of hrs monthly and a good way to change between weekdays and weekends so that weekend shift can jump into weekday and vice verse. Don't know even if that's possible so I turned to you. Is there any way?

 

Thanks

Ian says:
July 2nd, 2017 at 10:57 am   starstarstarstarstar      

Hi Bruce,

 

A suggestion for an 8 hr shift covering 24/7 with 4 crews of 8 ,,, or we might consider 5 crews of 6 people. overtime if needed is not an issue.

 

regards

Ian

July 2nd, 2017 at 1:45 pm   starstarstarstarstar      

Ian,

There is so much more than just recommending a pattern. I would need to know whether you want fixed shifts or rotating shifts, whether you want overtime in the schedule or not, and when your pay week begins. Then there is the issue of workload. Is it constant or do you need different coverage on certain shifts? And the final question is: why do you even want 8-hour shifts? From the employee perspective, they are probably the least attractive approach there is.

 

Schedules always involve trade-offs. Usually it's a trade-off between the number of consective days of work and the length of the breaks, especially the weekends off. Work 7 or 8 days in a row and you will maximize weekends off and have more 2-day breaks. Work 3 or 4 days in a row and get lots of 1-day breaks and few or no weekends off.

 

Bruce

Jovelyn Punzal says:
October 4th, 2017 at 5:35 pm   starstarstarstarstar      

Hello,


Another manager and I are trying to get every other Sunday off, with a total of 5, 8HR Shifts weekly. 40 Hours a week but for some reason we can't make it happen and we are now having to deal with even shorter shifts due to this adjustment. If someone could please email me asap with any ideas on how to make this happen asap. Please and thank you!

Plan:

2 managers. 40 hours a week. Every other Sunday off for both of us. 1 week Sunday off for her, the next week Sunday off for me, and so on!

Alex says:
December 11th, 2017 at 3:29 pm   starstarstarstarstar      

im having trouble with my shift plan, the mangement want us 1 person morning and 2 person evening with 5 people to play with to fufill this, but no matter how i play around with it my brain wont come up with a anwer , oh they want us to work 5 days on 2 off, but i think they will accept other solution if i can get it, plus any days extra that cannot be worked into the shift plan can be used to work in other department

please any help would be apreciated. 

Renee says:
April 4th, 2018 at 9:27 pm   starstarstarstarstar      

We are trying to get away from working 12 hr shift model 36/48 for 132 employees with 33 min each shift

Kayla Grimm says:
May 7th, 2018 at 4:27 pm   starstarstarstarstar      

4 people 40 hours

2 days off in a row

Every 4th weekend off 

1 st shift every Wednesday off 

Jennifer  says:
April 5th, 2020 at 8:33 am   starstarstarstarstar      
I need a schedule for 18 full time employees 24/7 with no overtime. Need at least 4 on day shifts starting at 0500, and 4 on night shift starting at 1700.
K Paez says:
April 24th, 2020 at 2:22 am   starstarstarstarstar      

Hi,

 

I have 8 agents that need to work 24/7 rotating shift... would you be able to help?

Name * 
Email * 
Rate This Post  
Spam Protection